Published March 1992 | Version v1
Report Restricted

Waste Receiving and Processing Facility, Module 1: Volume 6, Engineering assessments

Description

This report evaluates the ability of the WRAP Module 1 Facility to achieve the required material throughput by developing a time and motion simulation model of the facility using the WITNESS Simulation Program. Analysis of the simulation model indicated that the required throughput of 6825 drums per year based on working 5.5 hours in the Shipping ampersand Receiving and Waste Process areas and 7 hours in the NDA/NDE area for 175 days a year, as stated in the Functional Design Criteria (FDC) Rev. 1 and Supplemental Design Requirements Document (SDRD) Rev. 1, can be achieved

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92015020; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
949 p.
Report number
DOE/RL/11946--1-Vol.6

Optional Information

Contract/Grant/Project number
Contract AC06-91RL11946
Funding organization
USDOE, Washington, DC (United States).