Published March 1992
| Version v1
Report
Restricted
Waste Receiving and Processing Facility, Module 1: Volume 6, Engineering assessments
Description
This report evaluates the ability of the WRAP Module 1 Facility to achieve the required material throughput by developing a time and motion simulation model of the facility using the WITNESS Simulation Program. Analysis of the simulation model indicated that the required throughput of 6825 drums per year based on working 5.5 hours in the Shipping ampersand Receiving and Waste Process areas and 7 hours in the NDA/NDE area for 175 days a year, as stated in the Functional Design Criteria (FDC) Rev. 1 and Supplemental Design Requirements Document (SDRD) Rev. 1, can be achieved
Availability note (English)
MF available from INIS under the Report Number; OSTI as DE92015020; NTIS; INIS; US Govt. Printing Office Dep.
Files
Additional details
Publishing Information
- Imprint Pagination
- 949 p.
- Report number
- DOE/RL/11946--1-Vol.6
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23072318
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- ALPHA-BEARING WASTES; EFFICIENCY; ENGINEERING; HANFORD RESERVATION; LOW-LEVEL RADIOACTIVE WASTES; MATERIALS HANDLING; OPERATION; PRODUCTIVITY; RADIOACTIVE WASTE FACILITIES; RADIOACTIVE WASTE PROCESSING
- Descriptors DEC
- MANAGEMENT; MATERIALS; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; RADIOACTIVE MATERIALS; RADIOACTIVE WASTES; US DOE; US ORGANIZATIONS; WASTE MANAGEMENT; WASTE PROCESSING; WASTES
Optional Information
- Contract/Grant/Project number
- Contract AC06-91RL11946
- Funding organization
- USDOE, Washington, DC (United States).