Published 1996 | Version v1
Report

Barometric pumping with a twist: VOC containment and remediation without boreholes

Description

Objectives of Phase I (completed Nov. 1995) was to evaluate the feasibility of applying surface sealing and venting features to contain and remediate volatile organic compound (VOC) contaminated soils in the vadose zone. In Phase II, the remediation system will be installed at the Radioactive Waste Management Complex of INEL. It will cover an area of the landfill known to be contaminated with chlorinated hydrocarbons, deposited in shallow trenches. Operation will be monitored for 12 to 18 months to evaluate the impact on soil gas displacement. The 4 key components are the surface seal, plenum, vent assembly, and soil vapor monitoring points

Availability note (English)

Available from OSTI as DE97052233; NTIS; US Govt. Printing Office Dep.

Additional details

Publishing Information

Imprint Pagination
19 p.
Report number
DOE/MC/32109--97/C0791

Conference

Title
Industry partnerships to deploy environmental technology.
Dates
22-24 Oct 1996.
Place
Morgantown, WV (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
29015303
Subject category
S58: GEOSCIENCES;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
LAND POLLUTION; ORGANIC COMPOUNDS; REMEDIAL ACTION; SOILS; VOLATILE MATTER
Descriptors DEC
MATTER; POLLUTION

Optional Information