Published 1996 | Version v1
Journal article

Review of the main issues connected with the Belene NPP project

Creators

  • 1. National Electricity Company, IP 'Atomna Energetika', Belene (Bulgaria)

Description

The basic seismic studies connected with the construction of the second NPP in Bulgaria are outlined. The site selected for this plant is located on the right bank of the Donau River, near the Belene town. The seismicity of the site is investigated by the Bulgarian Academy of Sciences (BAS) and Energoproject Ltd., Sofia, and assessed by IAEA, Siemens, EQE and Westinghouse experts. The suggested coefficient for maximum seismic acceleration of 0.24 g takes into account the safety of the site, structures and equipment of the NPP. The conclusion made is that from seismic point of view the site is not hazardous. Construction works started in 1987 and were stopped in 1990 due to financial and socio-ecological reasons. The author's opinion is that the construction of the Belene NPP has no alternative and should be completed providing higher safety and reliability of the plant operation

Additional details

Additional titles

Original title (Bulgarian)
Obzor na po-vazhnite vyprosi, svyrzani s izgrazhdaneto na AETs Belene

Publishing Information

Journal Title
Dokladi na BYaD
Journal Volume
1
Journal Issue
1
Journal Page Range
p. 21-23.
ISSN
1310-8727