Published 1996 | Version v1
Book

Feedwater heater life optimization at Peach Bottom Atomic Power Station

  • 1. PECO Energy Co., Delta, PA (United States)
  • 2. Powerfect Inc., East Hanover, NJ (United States)

Description

This paper illustrates a complete inspection, testing, and maintenance program implemented at PECO Energy's Peach Bottom Atomic Power Station (PBAPS). Concerns that tubes may have been too conservatively plugged due to insufficient data justified a program that included: removal of previously installed plugs; videoprobe inspection of failed areas; extraction of tube samples for further analysis; eddy current testing of selected tubes; evaluation of the condition of insurance plugged tubes for return to service; hydrostatic testing of selected tubes; final repair plan based on the results of the above program. This paper concludes that no single method of inspection or testing should be solely relied upon in establishing: the extent of actual degraded conditions; the source(s) of failure mechanisms; and the details of repair. It is a combination of all gathered data that affords the best chance in arresting problems and optimizing feedwater heater life

Additional details

Publishing Information

Publisher
American Society of Mechanical Engineers.
Imprint Place
New York, NY (United States)
ISBN
0-7918-1226-X
Imprint Title
ICONE-4: Proceedings. Volume 4: Nuclear plant operations and maintenance, nuclear fuel cycle, institutional and energy policy, non-proliferation and safeguards
Imprint Pagination
745 p.
Journal Page Range
p. 7-17.

Conference

Title
ASME/JSME international conference on nuclear engineering.
Acronym
ICONE 4
Dates
10-13 Mar 1996.
Place
New Orleans, LA (United States).

Optional Information

Secondary number(s)
CONF-960306--.