Published September 1994 | Version v1
Report Open

Greater-than-Class C low-level radioactive waste characterization. Appendix A-2: Timing of greater-than-Class C low-level radioactive waste from nuclear power plants

Description

Planning for the storage or disposal of greater-than-Class C low-level radioactive waste (GTCC LLW) requires characterization of that waste. Timing, or the date the waste will require storage or disposal, is an integral aspect of that planning. The majority of GTCC LLW is generated by nuclear power plants, and the length of time a reactor remains operational directly affects the amount of GTCC waste expected from that reactor. This report uses data from existing literature to develop high, base, and low case estimates for the number of plants expected to experience (a) early shutdown, (b) 40-year operation, or (c) life extension to 60-year operation. The discussion includes possible effects of advanced light water reactor technology on future GTCC LLW generation. However, the main focus of this study is timing for shutdown of current technology reactors that are under construction or operating

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE96002384; NTIS; US Govt. Printing Office Dep.

Files

27032239.pdf

Files (745.3 kB)

Name Size Download all
md5:2c63d6819f1cf75b1a99970f90bd5966
745.3 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
23 p.
Report number
DOE/LLW--114A-2

Optional Information

Contract/Grant/Project number
Contract AC07-76ID01570
Funding organization
USDOE, Washington, DC (United States).