Published 1984 | Version v1
Miscellaneous Open

Preparing nuclear power plant units for operation

  • 1. Atomova Elektraren Bohunice, Jaslovske Bohunice (Czechoslovakia)

Description

The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

Files

17022956.pdf

Files (94.7 kB)

Name Size Download all
md5:2209bbac683efe3c30cd1fe537aa410f
94.7 kB Preview Download
Part of:
Economics, operating reliability and safety of WWER-440 type nuclear power plants. Part I

Additional details

Additional titles

Original title (Slovak)
Priprava prevadzky blokov JE

Publishing Information

Imprint Title
Economics, operating reliability and safety of WWER-440 type nuclear power plants. Part I
Imprint Pagination
240 p.
Journal Page Range
p. 15-1 - 15-3.
Report number
INIS-mf--10109

Conference

Title
Conference on economics, operating reliability and safety of WWER-440 type nuclear power plants.
Dates
20-22 Nov 1984.
Place
Tatranska Lomnica (Czechoslovakia).

INIS

Country of Publication
Serbia and Montenegro
Country of Input or Organization
Serbia and Montenegro
INIS RN
17022956
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BOHUNICE V-1 REACTOR; BOHUNICE V-2 REACTOR; PLANNING; REACTOR MAINTENANCE; REACTOR OPERATION; REPAIR
Descriptors DEC
ENRICHED URANIUM REACTORS; MAINTENANCE; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS

Optional Information

Notes
Imprint:Ekonomika, prevadzkova spolahlivost a bezpecnost JE typu VVER 440. I. cast.;Texty referatov.