The Canadian heavy water situation
Creators
- 1. Atomic Energy of Canada Ltd., Ottawa, Ontario. Heavy Water Projects
Description
Existing heavy water plants in Canada are producing at a satisfactory rate and currently planned capacity is in balance with projected needs. By 1980, we shall have Girdler-Sulphide plants installed with a design capacity of almost 600 kg/h. Effort is required to minimize production costs for heavy water and to ensure that costs do not increase faster than the current inflationary trend. (Author)
Availability note (English)
MF available from INIS under the Report Number.Files
7244596.pdf
Files
(663.0 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:4136759c7e8340a9279a53f91ab5f0ee
|
663.0 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 8 p.
- Report number
- AECL--5248
Conference
- Title
- 15. annual international conference, Canadian Nuclear Association.
- Dates
- 15 Jun 1975.
- Place
- Ottawa, Canada.
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 7244596
- Subject category
- S07: ISOTOPES AND RADIATION SOURCES;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CANADA; COST; DUAL TEMPERATURE PROCESS; HEAVY WATER
- Descriptors DEC
- HYDROGEN COMPOUNDS; ISOTOPE SEPARATION; ISOTOPIC EXCHANGE; NORTH AMERICA; OXYGEN COMPOUNDS; SEPARATION PROCESSES; WATER