HHT project. Phase I B. Quarterly Report 3/76

Description

Automatic translation: I. Important results in the reporting period: II. Reasons for deviations from the network plan, technical reorientation and cost changes: I. In the 3rd quarter, the planning documents for the HHT project a summary of the most important guidelines for cost recording and calculation is drawn up. This Report a list of the assemblies and of those assemblies processing companies and specialist departments within HRB and BBC and forms for calculating costs enclosed. For the 2nd position paper, the cost estimates for 1. Revised position paper, the changed technical Stand adapted and for the three variants INT, NINT and KD documented.

Abstract (German)

I. Wichtige Ergebnisse im Berichtszeitraum: II. Begründung für Abweichungen vom Netzplan, fachliche Umorientierung sowie Kostenänderung: I. Im 3. Quartal wurde als Planungsunterlage für das HHT-Projekt eine Zusammenfassung der wichtigsten Richtlinien zur Kostenerfassung und Kalkulation erstellt. Als Anhang wurde diesem Bericht eine Liste der Baugruppen und der diese Baugruppen bearbeitenden Firmen und Fachabtellungen Innerhalb HRB und BBC sowie Formblätter für die Kostenermittlung beigegeben. Zum 2. Positionspapier wurden die Kostenschätzungen zum 1. Positionspapier überarbeitet, dem geänderten technischen Stand angepaßt und für die drei Varianten INT, NINT und KD dokumentiert.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
HHT-Projekt. Phase I B. Quartalsbericht 3/76

Publishing Information

Imprint Pagination
54 p.
Report number
HRB-BA--1187

Optional Information

Notes
Document from Juelich Preservation Project