Changes to TSR control set due to changes in mission and lessons learned
Creators
- 1. Foppe and Associates, Golden, CO (United States)
- 2. Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site
Description
Previous Technical Safety Requirements (TSRs) established to support plutonium production activities at the Rocky Flats Environmental Technology Site (RFETS) were heavily focused on engineered safety features that would mitigate potential accidents. With the change in mission in 1992 to Site closure, and considering antiquated equipment nearing the end of their useful life, a change in philosophy was adopted to emphasize preventive controls that are mostly administrative. The new Administrative Controls (ACs) developed in the last few years include discrete attributes of safety management programs (SMPs) that are specifically credited to prevent or mitigate an accident, and include requirements on handling individual deviations, programmatic deficiencies, and TSR AC violations. The primary benefit of these changes is fewer requirements on equipment that allow the contractor more flexibility to maintain the defense-in-depth safety systems in a more cost-effective manner. A disadvantage of these new ACs is that implementation has become cumbersome and difficult to manage, e.g., resulted in an increased burden of demonstrating compliance and required an additional infrastructure to track deviations and deficiencies. In order to improve the efficiency of the authorization basis (AB) process to support accelerated Site closure according to the 2006 Plan, the Site has recently modified the ABs to better focus on the programmatic elements that were credited in the accident analyses, and to rely on the Integrated Safety Management System to implement SMPs via one general TSR AC requirement. At the request of DOE/RFFO, a self-assessment of the Rocky Flats AB program was performed in November 1998 by Victor Stello, DOE Headquarters, along with representatives from other DOE sites and Defense Programs. Results of this self-assessment confirmed that the proposed AC changes would be beneficial and provided specific recommendations
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99002579; NTIS; US GOVT. PRINTING OFFICE DEP.
Files
Additional details
Publishing Information
- Imprint Pagination
- 14 p.
- Report number
- RFP--5239
Conference
- Title
- Energy Facility Contractor Group 1999 safety analysis workshop
- Dates
- 13-18 Jun 1999
- Place
- Portland, OR (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30047105
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ADMINISTRATIVE PROCEDURES; DECOMMISSIONING; DECONTAMINATION; EVALUATION; MODIFICATIONS; PROGRAM MANAGEMENT; ROCKY FLATS PLANT; SAFETY ANALYSIS
- Descriptors DEC
- CLEANING; MANAGEMENT; NATIONAL ORGANIZATIONS; US AEC; US DOE; US ERDA; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC34-90RF62349
- Funding organization
- USDOE Assistant Secretary for Environment, Safety, and Health, Washington, DC (United States)
- Secondary number(s)
- CONF-990609--