Construction work on Muelheim-Kaerlich nuclear power station completed
Description
Early in 1973 Rheinisch-Westfaelische Elektrizitaetswerk AG awarded the contract for a 1300 MW nuclear power station with pressurized-water reactor, to be known as Muelheim-Kaerlich. Construction of this plant, which began in 1975, was influenced at different stages by many new technical requirements. Only in 1982 could a reliable estimate be made of the completion schedules for the design, manufacturing and assembly work. Non-nuclear commissioning of the plant as a whole began in April, 1985. The article reports on the nuclear power station and its construction. (Auth.)
Additional details
Publishing Information
- Journal Title
- Brown Boveri Rev.
- Journal Volume
- 74
- Journal Issue
- 6
- Series
- Brown Boveri Rev.
- Journal Page Range
- 314-321
- ISSN
- 0007-2486
- CODEN
- BRBOA
INIS
- Country of Publication
- Switzerland
- Country of Input or Organization
- Switzerland
- INIS RN
- 18090786
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CONSTRUCTION; MODIFICATIONS; MUELHEIM-KAERLICH REACTOR; NUCLEAR POWER PLANTS; RADIATION PROTECTION; REACTOR CONTROL SYSTEMS; REACTOR COOLING SYSTEMS; SPECIFICATIONS; STEAM GENERATORS
- Descriptors DEC
- BOILERS; CONTROL SYSTEMS; COOLING SYSTEMS; ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS