Published 1975
| Version v1
Report
Restricted
Oyster Creek Nuclear Power Plant, Unit 1. Semiannual operating report No. 12, January--June 1975
Description
The net electrical output was 1,544,941 MWH(e) with the generator on line 2, 740.62 hrs during this period. The plant operated with an availability factor of 65.17 percent. Data is presented concerning power generation, shutdowns, maintenance, chemistry and radiochemistry, occupational personnel radiation exposures, release of radioactive materials, and abnormal occurrences. (U.S.)
Availability note (English)
MF available from INIS under the Report Number.
Files
Additional details
Publishing Information
- Imprint Pagination
- 109 p.
- Report number
- DOCKET-50219--719
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 7225736
- Subject category
- S99: GENERAL AND MISCELLANEOUS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- FISSION PRODUCT RELEASE; OYSTER CREEK-1 REACTOR; PERSONNEL; POWER GENERATION; RADIATION DOSES; RADIOACTIVE EFFLUENTS; RADIOCHEMISTRY; REACTOR MAINTENANCE; REACTOR OPERATION; REACTOR SHUTDOWN; SOLID WASTES; TRANSPORT
- Descriptors DEC
- BWR TYPE REACTORS; CHEMISTRY; ENRICHED URANIUM REACTORS; MAINTENANCE; OPERATION; POWER REACTORS; RADIOACTIVE MATERIALS; RADIOACTIVE WASTES; REACTORS; THERMAL REACTORS; WASTES; WATER COOLED REACTORS; WATER MODERATED REACTORS