Published December 2020
| Version v1
Journal article
Study on the critical rod position prediction on CARR after shutdown and restarting
Creators
- 1. China Institute of Atomic Energy, Beijing (China)
Description
The iodine pit configuration from 5 MW to 60 MW at 3 core loading states has been calculated by MVP-BURN program. Based on the iodine pit depth and rod lattice worth calculated, the Visual C++ 6.0 platform was used to develop a quick search program. Experiments have shown that the prediction has good coincidence between the calculated rod position and the real operation value. It will provide an important reference for the safe start-up of the reactor in iodine pit later. (authors)
Additional details
Publishing Information
- Journal Title
- Nuclear Electronics and Detection Technology
- Journal Volume
- 40
- Journal Issue
- 6
- Journal Page Range
- p. 892-896
- ISSN
- 0258-0934
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 55086889
- Subject category
- S42: ENGINEERING; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CARR REACTOR; CONTROL ELEMENTS; FORECASTING; IODINE; OPERATION; SHUTDOWN; START-UP
- Descriptors DEC
- ELEMENTS; HALOGENS; NONMETALS; POOL TYPE REACTORS; REACTOR COMPONENTS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 11 figs., 15 refs.