Challenges during the decommissioning of the WAK site - Dismantling of highly contaminated HLLW-storage tanks - 16054

  • 1. Wiederaufarbeitungsanlage Karlsruhe, Rueckbau- und Entsorgungs-GmbH, 76344 Eggenstein-Leopoldshafen (Germany)

Description

The German pilot reprocessing plant WAK was shut down in 1990 after reprocessing about 200 Mg of nuclear fuels and is decided to be dismantled completely to the green field until year 2023. During the years 1994 until 2008 approximately 2.000 Mg of partly highly contaminated process equipment and 1.500 Mg of concrete structures corresponding to 99% of the radioactive inventory of 5 E14 Bq of the WAK reprocessing building have already been dismantled. A major prerequisite for the complete dismantling of the WAK is the management of the 60 m3 high-level liquid waste (HLLW) with a total β/γ-activity of 8.0 E17 Bq resulting from reprocessing. For this purpose the Karlsruhe Vitrification Plant (VEK) was constructed in the years between 2000 and 2005 and inactively tested in 2007. The subsequent nuclear test operation and routine hot operation of the VEK plant are planned to start mid-2009. In parallel to vitrification operation, dismantling of the four HLLW tanks in the storage buildings will be prepared for remote dismantling. (authors)

Additional details

Publishing Information

Publisher
American Society of Mechanical Engineers - ASME
Imprint Place
Fairfield, NJ (United States)
ISBN
978-0-7918-3865-X
Imprint Pagination
5 p.

Conference

Title
12. International Conference on Environmental Remediation and Radioactive Waste Management
Acronym
ICEM'09/DECOM'09
Dates
11-15 Oct 2009
Place
Liverpool (United Kingdom)

Optional Information

Notes
4 refs.; proceedings may be ordered by contacting: ASME Order Department, 22 Law Drive, P.O. Box 2300, Fairfield, NJ 07007-2300 (US)