Engineering testing requirements in FED/INTOR

Description

The FED/INTOR critical issues activity has addressed three key testing requirements that have the largest impact on the design, operation and cost of FED/INTOR. These are: (1) the total testing time (fluence) during the device lifetime, (2) the minimum number of back-to-back cycles, and (3) the neutron wall load (power density in the first wall/blanket). The testing program activities were structured into three tasks in order to define the benefits, and in some cases, costs and risks of these testing requirements. The three tasks were carried out with wide participation of experts from a number of organizations in the United States. Similar effort was performed by Japan, the European Community and the Soviet Union

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE83009589.

Files

14784938.pdf

Files (66.5 kB)

Name Size Download all
md5:ee855bec9025720334d95d977c326f16
66.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
CONF-830406--6

Conference

Title
5. topical meeting on technology of fusion energy.
Dates
26-28 Apr 1983.
Place
Knoxville, TN (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
14784938
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COST; ENGINEERING; INTOR TOKAMAK; NEUTRON FLUENCE; OPERATION; TESTING; THERMONUCLEAR REACTORS; TOKAMAK DEVICES; WALL LOADING
Descriptors DEC
CLOSED PLASMA DEVICES; POWER DENSITY; THERMONUCLEAR DEVICES