Published May 14, 2002 | Version v1
Report

Set-up of PEP-II Longitudinal Feedback Systems for Even/Odd Bunch Spacings

Description

Feedback systems installed for control of coupled-bunch longitudinal instabilities in PEP-II collider have been designed to process bunch data at one half of the ring RF frequency. As a result these systems are ideally suited for controlling ring fills where only even or only odd RF buckets are populated (even bunch spacings). However in the operation of PEP-II per bunch charge considerations require fill patterns that alternately populate even and odd buckets. In this note we present a technique that allows to use existing hardware to provide feedback control of all bunches in such fills

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/799070-IZ7u1j/native/

Additional details

Publishing Information

Imprint Pagination
[vp.]
Report number
SLAC-PUB--9217

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33067127
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
BEAM BUNCHING; BEAM SHAPING; FEEDBACK; PEP STORAGE RINGS; PROCESS CONTROL
Descriptors DEC
BEAM DYNAMICS; CONTROL; DYNAMICS; MECHANICS; STORAGE RINGS

Optional Information

Contract/Grant/Project number
AC03-76SF00515
Funding organization
USDOE Office of Energy Research ER (United States)