Published May 11, 2004 | Version v1
Report

NUMERICAL SIMULATION ON THERMAL STRESS AND MAGNETIC FORCES OF CURRENT LEADS IN BEPC II

Description

Six pairs of low current leads are used for the superconducting interaction quadruple magnets (SCQ) in the Beijing Electron Positron Collider Upgrade (BEPCII). This paper presents analyses on the magnetic field induced by the current lead bundle as well as the magnetic forces on the leads. The thermal stress of the single lead is investigated. The stress of interference fitting for a novel insulator used for the current leads at various operating temperatures is analyzed

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/15008758-ryTbT5/native/

Additional details

Publishing Information

Imprint Pagination
6 p.
Report number
BNL--72491-2004-CP

Conference

Title
20. INTERNATIONAL CRYOGENIC ENGINEERING CONFERENCE AND EXHIBITION
Dates
11-14 May 2004
Place
Beijing (China)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
35087466
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEIJING ELECTRON-POSITRON COLLIDER; CRYOGENICS; MAGNETIC FIELDS; MAGNETS; SIMULATION
Descriptors DEC
ACCELERATORS; EQUIPMENT; LINEAR ACCELERATORS; STORAGE RINGS

Optional Information

Contract/Grant/Project number
KB0202011; AC02-98CH10886
Funding organization
DOE/OFFICE OF SCIENCE (United States)