Published February 1996
| Version v1
Journal article
Is the east-west power bridge economic?
Creators
Description
At the latest conference of the East-West Energy Bridge project in Warsaw on October 24-25, 1995, the majority opinion concluded that the vast trans-European hvdc network proposed for operation in 2010 could be economically financed and operated in spite of reservations by some German utilities. Anatoliy Dyakov, president of the Russian UPS (Unified Power System), recently said that Russia would shortly start building the line from Smolensk to Kaliningrad as the first stage of this project. (author)
Additional details
Publishing Information
- Journal Title
- Modern Power Systems
- Journal Volume
- 16
- Journal Issue
- 2
- Journal Page Range
- p. 21, 23, 25.
- ISSN
- 0260-7840
- CODEN
- MPSYDU
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 27045922
- Subject category
- S24: POWER TRANSMISSION AND DISTRIBUTION;
- Descriptors DEI
- BELARUS; CONSTRUCTION; ECONOMICS; FEDERAL REPUBLIC OF GERMANY; FINANCING; HVDC SYSTEMS; INTERCONNECTED POWER SYSTEMS; INTERNATIONAL COOPERATION; OPERATION; POLAND; POWER TRANSMISSION; RUSSIAN FEDERATION
- Descriptors DEC
- COOPERATION; DC SYSTEMS; DEVELOPED COUNTRIES; DEVELOPING COUNTRIES; EASTERN EUROPE; EUROPE; POWER SYSTEMS; WESTERN EUROPE