Determination of Low Level RF Control Requirements for Superconducting Cavities FR-om Microphonics Measurements
Description
In lightly beam loaded superconducting accelerators the rf power requirements are dictated by the maximum amount of microphonics that the system must be able to control and by the energy content of the cavity. In previous machines, such as heavy-ion boosters, the energy content of the cavities was relatively small and one could afford to specify a large control window and still use low power (∼100 W) rf sources. In newer accelerators that are being contemplated--such as the CEBAF 12 GeV upgrade or RIA--the energy content of the cavity is quite large requiring rf sources in excess of 10 kW. Conservatism in the control window specification would be quite costly; on the other hand loss of lock could have adverse effect on machine availability or beam property or even, in some cases, result in activation. We present a model to estimate the requirements to be placed on the rf control system based on the properties of the cavities, the FR-equency tuning system, and the characteristics of the accelerator
Availability note (English)
Available from PURL: https://www.osti.gov/servlets/purl/811266-MoJt0w/native/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 382.1 Kilobytes
- Report number
- JLAB-ACP--03-91
Conference
- Title
- PAC 2003
- Dates
- 12-16 May 2003
- Place
- Seattle, WA (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 34043689
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATORS; AVAILABILITY; CAVITIES; CONTROL SYSTEMS; SPECIFICATIONS; TUNING; WINDOWS
- Descriptors DEC
- OPENINGS
Optional Information
- Contract/Grant/Project number
- AC--05-84ER40150
- Funding organization
- USDOE Office of Energy Research (ER) (United States)
- Secondary number(s)
- DOE/ER--40150-2497