Published May 1, 2003 | Version v1
Report

Determination of Low Level RF Control Requirements for Superconducting Cavities FR-om Microphonics Measurements

Description

In lightly beam loaded superconducting accelerators the rf power requirements are dictated by the maximum amount of microphonics that the system must be able to control and by the energy content of the cavity. In previous machines, such as heavy-ion boosters, the energy content of the cavities was relatively small and one could afford to specify a large control window and still use low power (∼100 W) rf sources. In newer accelerators that are being contemplated--such as the CEBAF 12 GeV upgrade or RIA--the energy content of the cavity is quite large requiring rf sources in excess of 10 kW. Conservatism in the control window specification would be quite costly; on the other hand loss of lock could have adverse effect on machine availability or beam property or even, in some cases, result in activation. We present a model to estimate the requirements to be placed on the rf control system based on the properties of the cavities, the FR-equency tuning system, and the characteristics of the accelerator

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/811266-MoJt0w/native/

Additional details

Publishing Information

Imprint Pagination
382.1 Kilobytes
Report number
JLAB-ACP--03-91

Conference

Title
PAC 2003
Dates
12-16 May 2003
Place
Seattle, WA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
34043689
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; AVAILABILITY; CAVITIES; CONTROL SYSTEMS; SPECIFICATIONS; TUNING; WINDOWS
Descriptors DEC
OPENINGS

Optional Information

Contract/Grant/Project number
AC--05-84ER40150
Funding organization
USDOE Office of Energy Research (ER) (United States)
Secondary number(s)
DOE/ER--40150-2497