Post-excavation analysis of a revised hydraulic model of the Room 209 fracture, URL, Manitoba, Canada

  • 1. Swedish Geological Co, Goeteborg (Sweden)
  • 2. Computations and Analysis Section, Applied Geoscience Branch, Atomic Energy of Canada Ltd., Pinawa, MB (Canada)

Description

An excavation response test was conducted in the Room 209 on the 240 m level of the AECL Underground Research Laboratory. Model predictions prior to excavation were made of the geomechanical response of the rock mass and the hydraulic response of an intercepted fracture. The model results were compared with excavation response data collected in a comprehensive instrument array. The work performed has addressed discrepancies between calculated and in-situ measured hydraulic response as part of a post-test analysis. Already existing hydraulic conceptual models of the fracture were revised and any available information was included in the new model. The model reproduced the pre-excavation hydraulic head distribution and hydraulic test results in terms of normalized flow rate within 5% and 75%, respectively. It was also found that the model reproduced the results of cross-hole hydraulic interference tests at least from a qualitative standpoint. The next stage of the modelling addressed the response of the model to a simulation of the excavated pilot tunnel. The preliminary results suggested the presence of a skin of different permeability in a thin zone around the periphery of the tunnel. By altering the permeability in the floor and along the walls and roof of the periphery, a better correspondence between calculated and measured drawdown was obtained. The same also applied for measured groundwater inflow in quantity, though not for the actual distribution on inflow. As probable causes for the interpreted positive skin in the crown and wall, temporary partial unsaturation and propulsion of debris into the fracture were suggested. The negative skin in the floor was interpreted as an effect of the dense and high energy charges used in the excavation process. (authors)

Availability note (English)

MF available from INIS under the Report Number.

Files

21058148.pdf

Files (833.9 kB)

Name Size Download all
md5:2eca1a2833b76397c98161f5f300ce14
833.9 kB Preview Download

Additional details

Additional titles

Subtitle (English)
A part of the joint AECL/SKB characterization of the 240 m level at the URL, Manitoba, Canada

Publishing Information

Imprint Pagination
46 p.
Report number
SKB-TR--89-27

INIS

Country of Publication
Sweden
Country of Input or Organization
Sweden
INIS RN
21058148
Subject category
S58: GEOSCIENCES;
Descriptors DEI
EXCAVATION; FRACTURES; GEOLOGIC MODELS; HYDRAULIC CONDUCTIVITY; PERMEABILITY; ROCKS; SKIN EFFECT
Descriptors DEC
FAILURES