Published February 2005 | Version v1
Journal article

Evaluation study on construction cost of FBR cycle system

  • 1. Japan Nuclear Cycle Development Inst., Tokai, Ibaraki (Japan)

Description

Although FBR cycle system is thought indispensable to sustainable utilization of nuclear energy, perspective on its economic has been highly concerned. Breakdowns of power generation cost of nuclear energy system (capitalized cost, operating cost and fuel cost) and their evaluation method are introduced and its application examples and measures improving economics are followed. Power generation cost is much dependable on reprocessing and fuel fabrication unit cost and fuel burn-up and thermal efficiency as well as FBR plant construction cost. (T. Tanaka)

Availability note (English)

Available from DOI: https://doi.org/10.3327/jaesj.47.95

Abstract (Japanese)

高速炉サイクルは、原子力の持続的利用に不可欠なシステムであり、その経済性見通しについて高い関心が寄せられている。本稿では、原子力エネルギーシステムの発電コストの内訳(資本費、運転費、燃料費)と、それらの評価手法を解説するとともに、その適用例および経済性向上方策を紹介する。(日本)

Additional details

Additional titles

Original title (Japanese)
高速炉サイクルシステムの経済性評価手法

Identifiers

Publishing Information

Journal Title
Nippon Genshiryoku Gakkai-Shi
Journal Volume
47
Journal Issue
2
Journal Page Range
p. 95-100
ISSN
0004-7120

Optional Information

Notes
6 refs., 4 figs., 1 tab.; This record replaces 36057620