Published March 2004 | Version v1
Journal article

The Study for Optimizing of the Electricity Power Supply in Central Java Province

  • 1. Center for Development of Nuclear Safety Technology, National Nuclear Energy Agency, Jakarta (Indonesia)

Description

Electricity planning includes identification of electricity generation potential and problem where solution are being planned through the annual program. Due to correlation between electricity growth and economic growth, the sensitivity study for Central Java province has been done using three scenarios of annual electricity growth, i.e.: 6.7 %, 8 % and 10 % within the study period of 2003-2020. The tool used in this sensitivity study is WASP IV. From result the calculation gives total installed capacity in the end of study period for each electricity growth scenario are 3960 MW, 5500 MW and 8620 MW respectively. Total produced energy in the end of study period for each electricity growth scenario are 32301 G Wh, 39619 G Wh and 54374 G Wh. For total fuel required. Coal still predominate in all scenarios, followed by HSD and Gas. According to this study, Nuclear power plant can be introduced in 2020 for scenario of 8 % growth and 2017 for that of 10 % growth. WASP is utilized for projecting electricity supply. (author)

Additional details

Additional titles

Original title (Indonesian)
Kajian Penyediaan Ketenagalistrikan secara Optimal di Propinsi Jawa Tengah

Publishing Information

Journal Title
Jurnal Pengembangan Energi Nuklir
Journal Volume
6
Journal Issue
1,2
Journal Page Range
p. 1-19
ISSN
1410-9816

Optional Information

Notes
6 refs.; 23 tabs.; 2 figs.