Published February 1999 | Version v1
Report Open

Safety evaluation of Tokai Reprocessing Plant (TRP). Evaluation on the prevention system

Description

JNC reflected on the fire and explosion incident of the bituminization facility and decided to evaluate on the safety of TRP voluntarily. This evaluation has included three activities, that is, (1) evaluation on the prevention system, (2) evaluation on the mitigation system, (3) confirmation on the method of the criticality safety analysis and the radiation shielding analysis. This report describes the results of the evaluation on the prevention system of the TRP's processes. We used HAZOP and FMEA to pick about 4000 abnormal conditions of each process up and selected about 700 abnormal transients. We estimated on a progress of all abnormal transients and confirmed proprieties of prevention systems. We will reflect these results to improvement of system and operation manual and to education, training for stuffs and operators. (J.P.N.)

Availability note (English)

Available from INIS in electronic form

Files

31010487.pdf

Files (57.4 MB)

Name Size Download all
md5:4bafab07d0dae325c5a58ca7602e487d
57.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
1767 p.
Report number
JNC-TN--8410-99-004

Optional Information

Notes
Published in 3 volumes