Published 2018 | Version v1
Book

Process parameters for electron beam welding of various parts of a 650 MHz five cell SCRF cavities

Description

RRCAT is working on technology development for manufacturing of SCRF cavities. Large number of high beta 650 MHz multi-cell SCRF cavities are required to accelerate beam from 500 MeV to 1GeV for the proposed SC proton Linac. A 15 KW EB welding machine has been in installed and successfully commissioned at RRCAT for fabrication of SCRF cavities. Using in-house EBW machine, initially a prototype single cell 650 MHz beta 0.92 SCRF cavity was fabricated to qualify the manufacturing process, tooling required for machining, and electron beam welding. Based on this experience, a 650 MHz five cell SCRF cavity has also been fabricated. The five cell cavity consist of dumbbells, Main coupler (MC) end group, Field probe (FP) end group and Titanium end cap. The paper presents complete manufacturing process sequence plan, weld joint design, covering weld parameters development, design and fabrication of welding, machining and dumbbell tuning fixtures. The paper describe half cells, fabrication of dumbbells, endgroups and their RF and Mechanical qualifications at intermediate stages and final equator welding. A proper weld shrinkage estimation and suitable allowance in various parts of SCRF cavity is essential to maintain target length and RF frequency at 300K. The paper also presents fabrication challenges like crucial equator weld, dissimilar welding between Niobium to Niobium-Titanium (Nb-Ti) and Nb-Ti to Titanium. The completed five cell SCRF cavity has been pre-qualified for dimensional measurement, vacuum leak testing and RF testing at 300K. (author)

Part of:
Proceedings of the eighth DAE-BRNS Indian particle accelerator conference

Additional details

Publishing Information

Publisher
Raja Ramanna Centre for Advanced Technology
Imprint Place
Indore (India)
Imprint Title
Proceedings of the eighth DAE-BRNS Indian particle accelerator conference
Imprint Pagination
1194 p.
Journal Page Range
p. 236-238

Conference

Title
8. DAE-BRNS Indian particle accelerator conference
Acronym
InPAC-2018
Dates
9-12 Jan 2018
Place
Indore (India)

INIS

Country of Publication
India
Country of Input or Organization
India
INIS RN
49078204
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ELECTRON BEAM WELDING; LINEAR ACCELERATORS; NIOBIUM; SUPERCONDUCTING CAVITY RESONATORS; WELDED JOINTS
Descriptors DEC
ACCELERATORS; CAVITY RESONATORS; ELECTRONIC EQUIPMENT; ELEMENTS; EQUIPMENT; FABRICATION; JOINING; JOINTS; METALS; REFRACTORY METALS; RESONATORS; SUPERCONDUCTING DEVICES; TRANSITION ELEMENTS; WELDING

Optional Information

Notes
2 refs., 7 figs., 1 tab.