Published April 1990 | Version v1
Journal article

Status of the anti-proton production beam in the CERN PS

  • 1. European Organization for Nuclear Research, Geneva (Switzerland)

Description

A new scheme was put into operation in November 1988 to upgrade the proton beam delivered by the 26 GeV Proton Synchrotron (PS) for anti-proton production. It makes use of quasi-adiabatic manipulations of the RF parameters to squeeze a beam filling 1/2 of the PS circumference into a 1/4 turn and can in theory preserve the longitudinal emittance. A maximum intensity of 1.68 e13 ppp in 5 bunches at 26 GeV has been reached in the course of 22 weeks of operation. The limitations of the performance are analysed together with possible improvements. (author) 6 refs., 9 figs

Additional details

Publishing Information

Journal Title
Particle Accelerators
Journal Volume
26
Journal Issue
1-4
Series
Part. Accel.
Journal Page Range
217-222
ISSN
0031-2460
CODEN
PLACB

Conference

Title
14. international conference on high energy accelerators.
Dates
22-26 Aug 1989.
Place
Tsukuba (Japan).

INIS

Country of Publication
United States
Country of Input or Organization
Switzerland
INIS RN
21075715
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ANTIPROTON SOURCES; BEAM EMITTANCE; CERN PS SYNCHROTRON; OPERATION; PERFORMANCE
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; PARTICLE SOURCES; RADIATION SOURCES; SYNCHROTRONS