Periodic Surveillance Testing (PST) Improvement Project is being performed by Korea Power Eng. Company, Inc. (KOPEC) as a contractor of Korea Hydro and Nuclear Power Co. Ltd (KHNP) together with Westinghouse Electric Company LLC (WEC) as a subcontractor. Plant Protection System (PPS) is not required during normal operation. Thus, the integrity of the PPS shall be confirmed via the periodic tests. However, the testing of Digital Plant Protection System (DPPS) takes too long time compared to that of the analog PPS. The excessive testing time imposes too much burden on the plant operator and could be a cause of human error. Thus, the test improvement for DPPS is needed to reduce the testing time. The improvement approach for the DPPS PST provides the recommended surveillance improvement to make the testing time shorten
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS autumn meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2008 autumn meeting of the KNS
- Dates
- 30-31 Oct 2008
- Place
- Pyongchang (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 40066848
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- DIGITAL SYSTEMS; ERRORS; INSPECTION; REACTOR OPERATION; REACTOR PROTECTION SYSTEMS
- Descriptors DEC
- ENGINEERED SAFETY SYSTEMS; OPERATION
Optional Information
- Notes
- 3 refs, 1 fig, 1 tab