Structural engineering characteristics in the environment of the thorium high temperature reactor (THTR)
Creators
- 1. Vereinigte Elektrizitaetswerke Westfalen A.G. (VEW), Dortmund (Germany, F.R.)
Description
When the construction work on the THTR 300 was commenced in May 1971 a total erection time of 61 month was planned. The actual construction period up to takeover however had lasted in February 1986 for 168 months. It is therefore no wonder that, in addition to the characteristics, such as for example pre-stressed concrete pressure vessel and wire mesh cooling tower, specific to the THRT, other special characteristics applied. There are those which in their application were technical innovations, which today already belong to 'know how', others, which resulted from changes in legislation and regulations and finally those which arose as a result of the requirements of the authorities. (orig./GL)
Additional details
Additional titles
- Original title (German)
- Bautechnische Besonderheiten im Umfeld des THTR
Publishing Information
- Journal Title
- VGB Kraftwerkstech.
- Journal Volume
- 67
- Journal Issue
- 10
- Series
- VGB Kraftwerkstech.
- Journal Page Range
- 1003-1005
- ISSN
- 0372-5715
- CODEN
- VGBKB
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 19023813
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BUILDINGS; CONSTRUCTION; ECONOMIZERS; ENGINEERING; FOUNDATIONS; GAMMA RADIATION; LICENSING; MEASURING METHODS; REACTOR SITES; STACKS; THTR-300 REACTOR; WATER TREATMENT
- Descriptors DEC
- ELECTROMAGNETIC RADIATION; ENRICHED URANIUM REACTORS; GAS COOLED REACTORS; GRAPHITE MODERATED REACTORS; HELIUM COOLED REACTORS; HOMOGENEOUS REACTORS; HTGR TYPE REACTORS; IONIZING RADIATIONS; MECHANICAL STRUCTURES; PEBBLE BED REACTORS; POWER REACTORS; RADIATIONS; REACTORS; SOLID HOMOGENEOUS REACTORS; SUPPORTS; THERMAL REACTORS; THORIUM REACTORS