Published October 1987 | Version v1
Journal article

Structural engineering characteristics in the environment of the thorium high temperature reactor (THTR)

  • 1. Vereinigte Elektrizitaetswerke Westfalen A.G. (VEW), Dortmund (Germany, F.R.)

Description

When the construction work on the THTR 300 was commenced in May 1971 a total erection time of 61 month was planned. The actual construction period up to takeover however had lasted in February 1986 for 168 months. It is therefore no wonder that, in addition to the characteristics, such as for example pre-stressed concrete pressure vessel and wire mesh cooling tower, specific to the THRT, other special characteristics applied. There are those which in their application were technical innovations, which today already belong to 'know how', others, which resulted from changes in legislation and regulations and finally those which arose as a result of the requirements of the authorities. (orig./GL)

Additional details

Additional titles

Original title (German)
Bautechnische Besonderheiten im Umfeld des THTR

Publishing Information

Journal Title
VGB Kraftwerkstech.
Journal Volume
67
Journal Issue
10
Series
VGB Kraftwerkstech.
Journal Page Range
1003-1005
ISSN
0372-5715
CODEN
VGBKB