Published 1984 | Version v1
Report

Competitive economics: nuclear and coal power

Creators

  • 1. Univ. of Rhode Island, Kingston

Description

Ignorance of the comparative economics and prematurity in adopting light water reactors characterize the nuclear industry, which has defied the laws of logic for learning. The absence of valid authoritative data to determine the economics of a newly ordered nuclear power plant is what leads to the methodological problems in making comparisons with coal. The author's solution adjusts the four most authoritative studies to reality: by the Atomic Energy Commission in 1975, a team of TRW and Mitre Corp. for ERDA in 1976, by the Nuclear Regulatory Commission in 1979, and by Exxon. The adjustments, which include original costs adjusted for lifetime; capital adjustments for sufflation, construction time, unit life, and capacity factor; fuel adjustments, and other adjustments involving management, replacement, maintenance, fuel prices, waste disposal, etc.) show that the total busbar cost per kWh from nuclear power units is 2.2 times that of coal. 7 references, 1 table

Additional details

Publishing Information

Imprint Title
Nuclear power in the Midwest: proceedings of the twelfth annual Illinois Energy Conference
Journal Page Range
p. 163-170.
Report number
CONF-8410315--

Conference

Title
12. annual Illinois energy conference.
Dates
31 Oct - 1 Nov 1984.
Place
Chicago, IL (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
17045495
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY; S29: ENERGY PLANNING, POLICY AND ECONOMY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CAPITALIZED COST; COMPARATIVE EVALUATIONS; ECONOMIC ANALYSIS; ECONOMICS; ENERGY ACCOUNTING; LEARNING; LIFETIME; NUCLEAR INDUSTRY; NUCLEAR POWER PLANTS; OPERATING COST; PERFORMANCE
Descriptors DEC
ACCOUNTING; COST; EVALUATION; INDUSTRY; MANAGEMENT; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS