New raw water supply for B-Plant fire foam system

Description

The raw water supply for the B-Plant Canyon foam fire suppression system is being replaced. The 4 inch water supply line to the foam system is being rerouted from the 6 inch raw water line in the Pipe Gallery to the 10 inch raw water main in the Operating Gallery. This document states the acceptance criteria for the flushing and testing which was performed by the contractor, and contains the completed data sheets for the tests. Four tests were performed and documented: operation of the supervisory position indicator; hydrostatic testing; leak check the system; and final system flush

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95005676; NTIS; US Govt. Printing Office Dep.

Files

26050539.pdf

Files (542.6 kB)

Name Size Download all
md5:a8dde775ceeeaf4c4ed29188a0946038
542.6 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
WHC-SD--WM-ATR-117

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).