Published 1999 | Version v1
Computer medium

In-core monitor housing replacement at Fukushima Daiichi Unit No.4

  • 1. Tokyo Electric Power Co., Inc. (Japan)

Description

The in-core monitor (ICM) housing replacement of a Boiling Water Reactor (BWR) has been completed at Fukushima-Daiichi Unit No. 4 (1F4) of the Tokyo Electric Power Company (TEPCO) in Japan. Since cracking of the inside surface of an ICM housing was found in this unit, the ICM housing was replaced with one made of low-carbon stainless steel (SS) to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. This project is the first application of the replacement procedure for the ICM housing and employs various advanced technologies. The outline of the ICM housing replacement project and applied technologies are discussed in this paper. (author)

Part of:
ICONE-7: Proceedings of the 7th international conference on nuclear engineering

Additional details

Publishing Information

Publisher
Japan Society of Mechanical Engineers
Imprint Place
Tokyo (Japan)
Imprint Title
ICONE-7: Proceedings of the 7th international conference on nuclear engineering
Imprint Pagination
4252 p.
Journal Page Range
[7 p.]

Conference

Title
7. international conference on nuclear engineering
Acronym
ICONE-7
Dates
19-23 Apr 1999
Place
Tokyo (Japan)

Optional Information

Notes
This CD-ROM can be used for WINDOWS 95/98/NT, MACINTOSH and UNIX; Acrobat Reader 3.0.1 is included; Data in PDF format, Track No. 02, ICONE-7450