Published July 1995 | Version v1
Report

Risk implication of severe accident management strategies

  • 1. Energy Research Inc., Rockville, Maryland (United States)
  • 2. Swiss Federal Nuclear Safety Inspectorate, Villigen-HSK (Switzerland)

Description

The Swiss Federal Nuclear Safety Inspectorate (HSK) is in the process of conducting independent Probabilistic Safety Analyses (PSAs) of all swiss nuclear power plants, in support of the ongoing periodic safety reviews, and other regulatory requirements. These studies are full scope level 1 / level 2 PSAs, including external events and uncertainties. The uncertainty analyses address both the so-called lack of knowledge uncertainties as well as stochastic uncertainties. These studies are being maintained as living PSA for use in regulatory decision making. An example level 2 study for a PWR type reactor, with large, dry containment is used for the present accident management study. In the analysis, the evaluation of accident progression does not credit automatic systemic recoveries (due to recovery of AC power, for instance), for lack of plant-specific data, and severe accident management strategies (SAMs), which are not yet implemented. The risk implications of SAMs are discussed in the present article. For all SAM strategies, with the exception of accident management involving SGTRs, all of the level 2 analyses are repeated

Part of:
Proceedings of the specialist meeting on selected containment severe accident management strategies

Additional details

Publishing Information

Imprint Title
Proceedings of the specialist meeting on selected containment severe accident management strategies
Imprint Pagination
358 p.
Journal Page Range
p. 67-75
ISSN
1104-1374
Report number
NEA-CSNI-R--1995-3

Conference

Title
Specialist meeting on selected containment severe accident management strategies
Dates
13-15 Jun 1994
Place
Stockholm (Sweden)

Optional Information

Notes
5 refs.
Secondary number(s)
SKI-R--95-34-SE