Published May 1999
| Version v1
Miscellaneous
Determination of preliminary plant operation logic for KALIMER
Description
In the KALIMER design, once-through helical coil steam generators are used to generate superheat steam. The once-through steam generator has its unique operational characteristics and a preliminary scheme for plant operation temperature. The operation temperature scheme determines typical thermal behaviors of the main systems in the plant and is the starting point in setting up the plant operation logic. Control features in plant operation between PWR and LMR are discussed including several technical aspects that need to be considered in developing the plant operation logic. Using HSGSA-RE code, calculational results on the operation logic are obtained. Based on the results, a preliminary operation logic for KALIMER is proposed
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Taejon (Korea, Republic of)
- Imprint Title
- Proceedings of the Korean Nuclear Society spring meeting
- Imprint Pagination
- [one CD-ROM]
- Journal Page Range
- [7 p.]
Conference
- Title
- 1999 spring meeting of the Korean Nuclear Society
- Dates
- 28-29 May 1999
- Place
- Pohang (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 33042340
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- COMPUTER CALCULATIONS; LIQUID METAL COOLED REACTORS; PWR TYPE REACTORS; STEAM GENERATORS; SUPERHEATING; U CODES
- Descriptors DEC
- BOILERS; COMPUTER CODES; ENRICHED URANIUM REACTORS; HEATING; POWER REACTORS; REACTORS; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 11 refs, 1 tab