Visual beam tube inspection at the TRIGA reactor Vienna

  • 1. Vienna University of Technology, Atominstitut of the Austrian Universities, Vienna (Austria)

Description

Of the four TRIGA beam tubes two have been visually inspected in 1985. Prior to the inspection the reactor was shut down for 3 weeks. The fuel elements around the beam tubes were removed. Stainless steel dummy elements were inserted in the fuel positions to shield the core radiation. The active part of the Fast Rabbit Tube was removed into the beam tube loading device and transferred to an interim storage: Front dose rate was ∼ 50 mSv/h. Generally the beam tube was very clean, after the last inspection about 30 years ago. A1 cm cut was observed at the beam tube front end. A rigid endoscope was used to check the beam tube's inner surface using a 90 degree deflection objective and photo- and video equipment. The direct dose rate in front of the beam tube was about 30 mSv/h. The beam tube was vacuum cleaned. A corroded shielding tank containing boric acid has leaked. A wooden collimator partially disintegrating due to extreme temperature was removed from beam tube D. Documentation of the inspection for visible defects is produced for later comparison

Files

40073507.pdf

Files (1.6 MB)

Name Size Download all
md5:630a302f049054910d0eca65b560d71e
1.6 MB Preview Download
Part of:
3. world TRIGA users conference. Papers and abstracts

Additional details

Publishing Information

Imprint Title
3. world TRIGA users conference. Papers and abstracts
Imprint Pagination
vp.
Journal Page Range
[24 p.]
Report number
INIS-BR--09N0001

Conference

Title
3. world TRIGA users conference
Dates
21-25 Aug 2006
Place
Belo Horizonte, MG (Brazil)

Optional Information

Notes
Published as PowerPoint presentation only