Published November 20, 2006 | Version v1
Journal article

Commissioning the Beam Diagnostics Systems for the CERN Low Energy Ion Ring

Description

Even though CERN's Large Hadron Collider (LHC) is mainly conceived to accelerate protons, a heavy ion physics program is also foreseen. In order to reach the luminosity required for LHC, the ion accelerator chain needed to be upgraded, and a central part is the new Low Energy Ion Ring (LEIR).Its role is to transform a series of long, low-intensity ion pulses from Linac-3 into short, high-density pulses which will be further accelerated in the PS and SPS rings before injection into LHC. To do so the injected pulses are stacked and phase-space cooled using electron cooling before acceleration to the ejection energy of 72 MeV/u. This note describes the different types of instruments used in the LEIR ring and transfer lines and reports on the first results obtained with O4+ and Pb54+ beams

Additional details

Identifiers

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
868
Journal Issue
1
Journal Page Range
p. 445-453
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
12. beam instrumentation workshop
Dates
1-4 May 2006
Place
Batavia, IL (United States)

INIS

Country of Publication
United States
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
38058458
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BEAM LUMINOSITY; CERN LHC; COMMISSIONING; ELECTRON COOLING; HEAVY IONS; ION RINGS; LINEAR COLLIDERS; MEV RANGE 10-100; PARTICLE BEAMS; PHASE SPACE
Descriptors DEC
ACCELERATORS; BEAM COOLING; BEAMS; CHARGED PARTICLES; CYCLIC ACCELERATORS; ENERGY RANGE; IONS; LINEAR ACCELERATORS; MATHEMATICAL SPACE; MEV RANGE; SPACE; STORAGE RINGS; SYNCHROTRONS

Optional Information

Notes
(c) 2006 American Institute of Physics