Browns Ferry Nuclear Plant Unit 2: Control rod drive scram discharge headers decontamination effort

Description

The control rod drive (CRD) scram discharge headers were decontaminated during the Browns Ferry unit 2, cycle 4 refueling outage (August 2-5, 1982). Hydrolasing (high-pressure water blasting) was used as the method of decontamination to remove fixed and loose radioactive contaminants from the headers. It was found that hydrolasing of the west scram discharge headers resulted in approximate maximum and average decontamination factors (DFs) on contact of 13 and 5, respectively. For the east scram discharge headers, hydrolasing resulted in a maximum and average DF on contact of approximately 3. The maximum and average DFs on contact for the individual headers ranged from 1 to 33 and 1 to 10, respectively, while the walkway (head-level) DFs were in the range of 3 to 4. Higher DFs were impeded by inadequate drainage and backwashing of fluid. This led to increased radiation levels in some areas and recontamination of adjacent headers

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A06; 3 as DE84900910.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
118 p.
Report number
TVA/OP/EDT--83/26