Published 2003 | Version v1
Book

The 3 MW ECRH/ECCD transmission and launching system on TORE SUPRA

  • 1. Association EURATOM-CEA, CEA/DSM/DRFC CEA-Cadarache, 13108 St Paul-Lez-Durance (France)

Description

The ECRH experiment on TORE SUPRA is designed to inject up to 3 MW of power at 118 GHz using an antenna consisting of six fixed spherical mirrors and three mobile steering mirrors. The position of the mobile mirrors can be varied in real time using two stepper motors for each mobile mirror. In addition to controlling the injection angle, the position of the mobile mirrors also affects the polarisation of the injected wave. Accurate formulae to compute, in real time, the stepper motor positions required to obtain the desired beam injection angles have been derived. Formulae to determine the effect on the wave polarisation, of the actual mobile mirror positions have also been determined. These formulae have been verified by precise laser measurements and by comparison of power deposition calculations and experimental results. (authors)

Part of:
Proceedings of the 12. Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Heating

Additional details

Publishing Information

Publisher
World Scientific Publishing Co. Pte. Ltd.
Imprint Place
Singapore (Singapore)
ISBN
981-238-189-9
Imprint Title
Proceedings of the 12. Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Heating
Imprint Pagination
610 p.
Journal Page Range
p. 309-316

Conference

Title
12. Joint Workshop on Electron Cyclotron Emission and Electron Cyclotron Heating
Dates
13-16 May 2002
Place
Aix-en-Provence (France)

Optional Information

Notes
11 refs., 7 figs.