Published 2001 | Version v1
Report Open

The Wipp Disposal Decision Plan: the Successful Road Map for Transparent and Credible Decision-Making

  • 1. GRAM, Inc., Albuquerque, NM (United States)

Description

The Waste Isolation Pilot Plant (WIPP) deep geological repository for long-lived, transuranic radioactive waste (TRUW) opened on the 26th of March 1999. Beginning on the 4th of April 1994, the United States Department of Energy (DOE), implemented the WIPP Disposal Decision Plan (DDP), which embodied the five-year vision and intents of the then DOE Manager of the Carlsbad Area Office (CAO), presently the Carlsbad Field Office (CBFO). The successful design and implementation of the DDP ensured good science, enhanced regulator and stake holder (affected and interested parties) interactions and acceptance of programmatic decisions, which resulted in the certification of the WIPP TRUW repository by the U.S. Environmental Protection Agency (EPA) on the 18th of May 1998, almost three years earlier than projected in November 1993. The present paper contains three sections: A concise background information on the CBFO's TRUW disposal program, incl. the legal framework, current status, and author-envisioned challenges and solutions; A description of the main components and attributes of the WIPP DDP. A summary of the lessons learned during and after the 1994 through 1998 implementation of the WIPP DDP

Files

34086332.pdf

Files (418.8 kB)

Name Size Download all
md5:4ff31307ab8ec4358725310a56e7df8d
418.8 kB Preview Download
Part of:
VALDOR. Values in decisions on risk. Proceedings

Additional details

Publishing Information

Imprint Title
VALDOR. Values in decisions on risk. Proceedings
Imprint Pagination
535 p.
Journal Page Range
p. 326-333
Report number
NEI-SE--436

Conference

Title
VALDOR 2001. Values in Decisions on Risk. 2. VALDOR symposium addressing transparency in risk assessment and decision making
Dates
10-14 Jun 2001
Place
Stockholm (Sweden)

Optional Information

Notes
16 refs., 3 figs