Published July 2018 | Version v1
Miscellaneous

Secondary chemical water management at the restart of Sendai Nuclear Power Station after a long-term maintenance

  • 1. Kyushu Electric Power Co., Inc., Fukuoka (Japan)

Description

Sendai Nuclear Power Station Unit No. 1 had been in a long-term maintenance after the Fukushima Daiichi Nuclear accident. However, based on passing with new regulatory requirements introduced by the Nuclear Regulation Authority, it returned to normal operation of September 10, 2015. In this paper, we will describe about secondary chemical water management in a long-term maintenance and at the restart of nuclear power station. (author)

Part of:
Proceedings of the 15th annual meeting of Japan Society of Maintenology

Additional details

Additional titles

Original title (Japanese)
川内原子力発電所1号機再稼働時の2次系水質管理

Publishing Information

Imprint Title
Proceedings of the 15th annual meeting of Japan Society of Maintenology
Imprint Pagination
[516 p.]
Journal Page Range
p. 66-69

Conference

Title
15. annual meeting of Japan Society of Maintenology
Dates
10-12 Jul 2018
Place
Fukuoka (Japan)

Optional Information

Notes
11 figs. Imprint:#65E5##672C##4FDD##5168##5B66##4F1A##7B2C#15#56DE##5B66##8853##8B1B##6F14##4F1A##8981##65E8##96C6#