Published March 2017 | Version v1
Miscellaneous Open

Exploration on the optimization of quality management system on nuclear power project

  • 1. Tianlin Road, Shanghai, (China)

Description

In order to promote the standardization and a mass construction of the third-generation nuclear power plant, as well as facilitate the upgrade of Chinese nuclear power equipment, AP1000 [Advanced Passive PWR] nuclear power has established a comparatively mature quality management system which has achieved good result through years of practice. During AP1000 nuclear power plant construction, Chinese engineers learn a lot of managerial experience, besides, within the combination of HAF003 [nuclear power station quality assurance safety requirements] and its guide rules, Chinese developed a whole set of AP1000 quality management. However, Quality management needs continuous improvement, as the follow-up plants start working, lots of beneficial attempt are being conducted on operation, evaluation and optimization of quality management system on AP1000 nuclear power project. (abstract)

Files

48047941.pdf

Files (129.7 kB)

Name Size Download all
md5:18ae01cc6cc84e2ba1b4e7f9e5e57959
129.7 kB Preview Download
Part of:
First Conference on African Youth Nuclear Summit 2017: Nuclear for a Sustainable Future

Additional details

Publishing Information

Imprint Title
First Conference on African Youth Nuclear Summit 2017: Nuclear for a Sustainable Future
Imprint Pagination
[521 p.]
Journal Page Range
2 p.
Report number
INIS-KE--010

Conference

Title
1. Conference on African Youth Nuclear Summit
Acronym
AYNS2017
Dates
27-30 Mar 2017
Place
Nairobi (Kenya)

Optional Information

Notes
2 figs.