There is a newer version of the record available.

Published October 2009 | Version v1
Miscellaneous

Automation of LP ECC for Wolsong 1

  • 1. Korea Power Engineering Company, Daejeon (Korea, Republic of)
  • 2. Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

Description

When low dousing tank level alarm comes in, the operator manually initiates Low Pressure (LP) injection. Valves PV1 and PV2 are selected open and once the valves are open, valves PV10 and PV11 are selected closed. Valves PV506 1 and 506 2 are selected open to supply cooling water to heat exchanger (HX1). Manual initiation of LP injection can cause human error resulting in ECC unavailable. To eliminate this kind of error, the Wolsong 1 ECC is required to be changed from Manual to Automatic LP injection similar to Wolsong 2 ECC

Part of:
Transactions of the Korean Nuclear Society Autumn Meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2009 autumn meeting of the KNS
Dates
29-30 Oct 2009
Place
Kyungju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
41027418
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ALARM SYSTEMS; AUTOMATION; COOLING; ERRORS; HEAT EXCHANGERS; VALVES; WATER; WOLSUNG-1 REACTOR; WOLSUNG-2 REACTOR
Descriptors DEC
CANDU TYPE REACTORS; CONTROL EQUIPMENT; EQUIPMENT; FLOW REGULATORS; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; HYDROGEN COMPOUNDS; NATURAL URANIUM REACTORS; OXYGEN COMPOUNDS; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; THERMAL REACTORS

Optional Information

Notes
7 refs, 2 figs, 1 tab