Published November 1993
| Version v1
Journal article
The steam generator changeout at Beznau-1
Creators
Description
At the Beznau-1 nuclear power plant in Switzerland, the unit's two steam generators were replaced in the second quarter of 1993. The steam generator replacement portion of the outage - the period from when contractors were given access to the containment to when the steam generators were ready for hydrostatic pressure testing - was 44 days (April 12- May 26, 1993), shorter than the 46 days gained. Total length of the outage was 99 days (April 2 - July 9). Collective radiation dose received by project personnel was 110 person-rem, much less than the planned 250 person-rem. Project cost was about $50 million, including the new SGs and the replacement work, according to Nordostschweizerische Kraftwerke AG (NOK), plant owner and operator
Additional details
Publishing Information
- Journal Title
- Nuclear News (La Grange Park, Illinois)
- Journal Volume
- 36
- Journal Issue
- 14
- Journal Page Range
- p. 37-40.
- ISSN
- 0029-5574
- CODEN
- NUNWA8
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26016979
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- BEZNAU-1 REACTOR; REACTOR COMPONENTS; REACTOR SHUTDOWN; RETROFITTING; STEAM GENERATORS
- Descriptors DEC
- BOILERS; ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SHUTDOWN; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS