Published March 22, 2013 | Version v1
Journal article

Instrumentation upgrade for Top-Up operations at the Australian Synchrotron

  • 1. Australian Synchrotron, 800 Blackburn Road, Clayton VIC 3168 (Australia)

Description

The Australian Synchrotron introduced Top-Up operations in May 2012. Upgrading the machine for Top-Up has required major developments in many of the accelerator systems. Investigations prior to the start of Top-Up operations demonstrated that the Infrared Microspectroscopy beamline was particularly sensitive to injection noise. A gating event has been implemented as part of our timing system upgrade to pause the data collection during injection. In Top-Up mode injections can happen when the gaps of insertion devices are closed. A variable vertical aperture has been installed in the BTS to scape potentially damaging electrons and protect the equipment.

Availability note (English)

Available from http://dx.doi.org/10.1088/1742-6596/425/4/042015

Additional details

Publishing Information

Journal Title
Journal of Physics. Conference Series (Online)
Journal Volume
425
Journal Issue
4
Journal Page Range
[4 p.]
ISSN
1742-6596

Conference

Title
11. international conference on synchrotron radiation instrumentation
Acronym
SRI 2012
Dates
9-13 Jul 2012
Place
Lyon (France)

INIS

Country of Publication
United Kingdom
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
44119416
Subject category
S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
APERTURES; ELECTRONS; EQUIPMENT; INJECTION; NOISE; SYNCHROTRONS
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; ELEMENTARY PARTICLES; FERMIONS; INTAKE; LEPTONS; OPENINGS