Shutdown chemistry optimization at Maanshan NPP

  • 1. Maanshan Nuclear Power Station, Taiwan Power Company, Taiwan (China)
  • 2. Dept. of Nuclear Generation, Taiwan Power Company, Taiwan (China)

Description

At Maanshan PWRs, a significant piping radiation buildup caused by crud burst from fuel surface in the beginning of RFO used to be blamed as a contribution to high personal exposures during outage. Therefore, several modifications on shutdown chemistry procedures such as, early lithium removal, rapid boration, dissolved hydrogen removal, extended RCP operation, and maintaining maximum let down flow, have been consecutively conducted since no.1RFO-16, 2006. The important operational and chemical parameters of modified shutdown chemistry procedures adopted in no.2 RFO-17, 2008 and superiority in low reading (2 mSv/hr) from let down heat exchangers area radiation monitor over 11mSv/hr of no.1 RFO-16 at the same area will be addressed in this paper. At the end of no.2 RFO-17, low personal exposures of 765 man-mSv (TLD)verified the absence of crud burst during shutdown chemistry process and broke records of Maanshan NPP as well. Even with a new job on PZR pre-emptive dissimilar weld overlay which exhausting 17.37% of total 797 man-mSv(TLD) in the latest no.1 RFO-18, 659 man-mSv (TLD) made another record low in the history of Maanshan. (author)

Part of:
Symposium on water chemistry and corrosion in nuclear power plants in Asia 2009. Proceedings

Additional details

Publishing Information

Imprint Title
Symposium on water chemistry and corrosion in nuclear power plants in Asia 2009. Proceedings
Imprint Pagination
346 p.
Journal Page Range
p. 303-308

Conference

Title
Symposium on water chemistry and corrosion in nuclear power plants in Asia 2009
Dates
28-30 Oct 2009
Place
Nagoya, Aichi (Japan)

Optional Information

Notes
5 figs., 5 tabs.