Published December 1978
| Version v1
Report
Restricted
GRIST-2 preliminary test plan and requirements for fuel fabrication and preirradiation
Description
The preliminary version of the GRIST-2 test plan has been developed for the planned initial 5 years (1984 to 1989) of TREAT-Upgrade in-pile tests. These tests will be employed to study the phenomenology and integral behavior of GCFR core disruptive accidents (CDAs) and to support the Final Safety Analysis Report (FSAR) CDA analyses for the demonstration plant licensing. The preliminary test plan is outlined. Test Phases I and II are for the fresh fuel (preconditioned or not) CDA behavior at the beginning-of-life (BOL) reactor state. Phase III is for the reactor state that contains irradiated fuel with a saturated content of helium and fission gas. Phase IV is for larger bundle tests and scaling effects
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A04/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 54 p.
- Report number
- GA-A--15121
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 10473275
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- GCFR REACTOR; PLANNING; REACTOR CORE DISRUPTION; REACTOR SAFETY; RESEARCH PROGRAMS
- Descriptors DEC
- ACCIDENTS; BREEDER REACTORS; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; GAS COOLED REACTORS; GCFR TYPE REACTORS; REACTOR ACCIDENTS; REACTORS; SAFETY