Estimating the Required Flow Rate to Lift an Absorber in the Shutdown System of Nuclear Reactors
- 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)
Description
Many of the research reactors use electro-magnetic force or hydraulic force to lift and grab an absorber in the shutdown system. When the shutdown system actuation signal occurs, the lifting force is stopped and the absorber drops in order to shutdown the reactor. The present study deals with the shutdown system using hydraulic force to lift the absorber at a predetermined position. The required flow rate to lift the absorber is the key design parameter. The pressure drop while the operating fluid flows around the absorber and the buoyancy force determine the required flow rate. The detailed calculation procedure to obtain the required flow rate and the experimental result will be shown in the present paper
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS autumn meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2009 autumn meeting of the KNS
- Dates
- 29-30 Oct 2009
- Place
- Kyungju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 41027087
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- COMPUTER CALCULATIONS; DESIGN; FLOW RATE; FLUID FLOW; HYDRAULICS; PRESSURE DROP; REACTOR SHUTDOWN; RESEARCH REACTORS
- Descriptors DEC
- FLUID MECHANICS; MECHANICS; REACTORS; RESEARCH AND TEST REACTORS; SHUTDOWN
Optional Information
- Notes
- 3 refs, 3 figs, 1 tab