Review of alignment activities for indus-1 and 2 at CAT
Description
Survey and alignment activities at CAT (Centre for Advanced Technology - India) are related to two accelerator projects called INDUS-1 and INDUS -2. Former is a 450 MeV SRS and latter is a 2.5 GeV SRS. Both the machines use a 450/700 MeV booster synchrotron and 20 MeV pre-injector microtron for injection. Indus-1 was commissioned with 100 mA stored beam current in May 1999. Indus-2 is under construction and expected to be commissioned within next 4 years. Survey and alignment work of booster synchrotron and Indus-1 (storage ring) was accomplished using optical surveying techniques with software ECDS-2 of Kern. That was possible due to small size of machines of Indus-1. For Indus-2 with circumference of 172.47 m, the network surveying and alignment scheme has been planned. Indus-2 is a high brilliance machine and this puts more stringent requirements on alignment. This paper describes methodology and performance results of Indus-1 alignment and strategy for Indus-2. (authors)
Availability note (English)
Available from INIS in electronic formFiles
32068810.pdf
Files
(168.7 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:1691c6298f444c27f4bfe992d6674409
|
168.7 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- [6 p.]
- Report number
- INIS-FR--398
Conference
- Title
- 6. International workshop on accelerator alignment IWAA99
- Dates
- 18-22 Oct 1999
- Place
- Grenoble (France)
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 32068810
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ALIGNMENT; COMPUTER CODES; DISPLACEMENT GAGES; INDUS-1; INDUS-2; MULTIPOLES; SPECIFICATIONS; SYNCHROTRONS; TOLERANCE
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; MEASURING INSTRUMENTS; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES
Optional Information
- Notes
- 2 refs.