Published 1988 | Version v1
Journal article

Self-paced training for quality control inspectors

  • 1. Westinghouse Electric Corp., Pittsburgh, PA (USA)

Description

The authors discuss the need for quality control (QC) training in the nuclear industry and propose requirements for QC training. This paper presents an overview of a self-paced training program for QC, including the characteristics and structure of such a program

Additional details

Publishing Information

Journal Title
Proceedings of the American Power Conference
Journal Volume
50
Series
Proc. Am. Power Conf.
Journal Page Range
667-670
ISSN
0097-2126
CODEN
PAPWA

Conference

Title
American power conference.
Dates
18-20 Apr 1988.
Place
Chicago, IL (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
21053970
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
EDUCATION; NUCLEAR POWER PLANTS; PERSONNEL; QUALITY CONTROL; REACTOR MONITORING SYSTEMS
Descriptors DEC
CONTROL; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
CONF-880403--.