Published May 1989 | Version v1
Report Open

Vacuum and beam pipe considerations. Pt.1, 2

Description

A high vacuum will be required in a KAON factory to reduce scattering, beam-induced multipactoring, beam neutralization, and beam-induced desorption. The TRIUMF KAON group has let contracts for the development of ceramic pipes with rf shields. Analysis of the effect of beam spill on the temperature of the ceramic pipe has been started

Availability note (English)

MF available from INIS under the Report Number.

Files

23001920.pdf

Files (111.7 kB)

Name Size Download all
md5:a15884b75725bd0a156ce86be7e3171d
111.7 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
TRI-PP--89-50

Conference

Title
AHF accelerator design workshop.
Dates
20-24 Feb 1989.
Place
Los Alamos, NM (United States).

INIS