Erection and commissioning of technical plants - process phases, risks, losses

  • 1. Allianz Versicherungs-A.G., Muenchen (Germany, F.R.). Abt. Technische Versicherungen

Description

The focal point of the risks involved in the supply and erection of industrial plants changes between the initial setting up of the site and final handing over. That is the subject of this contribution. Various process phases and typical causes of damage are described on the basis of examples. The author elucidates different supply contractual agreements and terms, such as testing period. The effects in the event of loss or damage occuring are demonstrated. (orig.)

Abstract (German)

Die mit Lieferung und Erstellung von Industrieanlagen verbundenen Risiken veraendern ihre Schwerpunkte zwischen der ersten Einrichtung der Baustelle und der endgueltigen Uebergabe. Sie sind Gegenstand dieses Beitrages. Es werden Beispiele fuer verschiedene Ablaufphasen und typische Schadenursachen gegeben. Der Verfasser erlaeutert unterschiedliche liefervertragliche Vereinbarungen und Begriffe, z.B. Erprobungszeitraum. Die Auswirkungen im Schadenfall werden aufgezeigt. (orig.)

Additional details

Additional titles

Original title (German)
Montage und Inbetriebnahme technischer Anlagen - Ablaufphasen, Risiken, Schaeden

Publishing Information

Journal Title
Maschinenschaden
Journal Volume
49
Journal Issue
4
Series
Maschinenschaden.
Journal Page Range
145-154

Conference

Title
9. Allianz forum on engineering and insurance.
Dates
19 May 1976.
Place
Muenchen, Germany, F.R.

INIS

Country of Publication
Germany
Country of Input or Organization
Germany
INIS RN
8310605
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CONSTRUCTION; FAILURES; INDUSTRIAL PLANTS; PERFORMANCE TESTING; POWER PLANTS; REACTOR COMMISSIONING
Descriptors DEC
TESTING

Optional Information

Notes
16 figs.; 12 refs.