Published 2006 | Version v1
Miscellaneous

Assessment on the Success Criteria and the Human Error Probability of the Power Uprated Plant

  • 1. F and C Co., Ltd., Seoul (Korea, Republic of)
  • 2. Korea Hydro and Nuclear Power Co., Ltd. Taejon (Korea, Republic of)

Description

Numerous power uprate applications for nuclear power plants (NPP) were approved (109 applications) in the United States since 1970, while the first NPP power uprate is planned for Kori 3 and 4 / Yonggwang 1 and 2 in Korea. There are three categories of power uprate ; (1) MUR (Measurement Uncertainty Recapture power uprate), which is less than 2 percent and can be achieved by implementing the enhanced techniques for reactor power calculations ; (2) SPU (Strech Power Uprate), which is typically up to 7 percent and does not involve major plant modifications ; (3) EPU (Extended Power Uprate), which is usually as high as 20 percent and requires significant modifications to the major BOP equipment. USNRC requires licensees to evaluate the effect of power uprate on the plant specific PSA results for EPU by issuing the regulatory guidance RS-001, but it does not require the PSA evaluation for SPU and MUR plants. There is no established regulatory guidance for the PSA evaluations of power uprated plants in Korea. Since the power uprates for Kori 3 and 4 / Yonggwang 1 and 2 will be SPU, there is no general guidance for their PSA evaluations. But, after reviewing many reference foreign documents related to the PSA evaluations for EPU, we discovered that the main changes related to the power uprates were as follows. (1) The decay heat removal success criteria (2) The dynamic operator actions (3) The fission product inventories This paper discusses the changes of the plant specific level 1 PSA for Kori 3 and 4 / Yonggwang 1 and 2 by SPU, and it is mainly focused on the changes of the success criteria and the human error probabilities in the PSA model

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Taejon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2006 autumn meeting of the KNS
Dates
2-3 Nov 2006
Place
Kyongju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
38049491
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
COMPUTER CALCULATIONS; DECAY; ERRORS; NUCLEAR POWER PLANTS; PROBABILITY; PWR TYPE REACTORS; REMOVAL; SAFETY ANALYSIS
Descriptors DEC
ENRICHED URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
7 refs, 4 tabs