Published June 1985 | Version v1
Report

Swedish programme for quality assurance of reactor waste

  • 1. Swedish Nuclear Fuel and Waste Management Co., Stockholm

Description

A final repository for reactor waste radwaste is under construction in Sweden. The facility will be taken into operation in 1988. With the construction of it the handling sequence for reactor waste has been completed. It is thus now possible to assess in a systematic way the requirements on the waste packages in each step of the handling sequence, production-storage-transport-disposal, and the quality control procedure needed to show that the requirements are fulfilled. With the Swedish waste management system as a background, the methodology to perform this assessment is discussed in this paper. (orig./PW)

Additional details

Publishing Information

Imprint Title
Radioactive waste products - suitability for final disposal
Imprint Pagination
645 p.
Journal Page Range
p. 44-53.
Report number
Juel-Conf--54

Conference

Title
International seminar on radioactive waste products - suitability for final disposal.
Dates
10-13 Jun 1985.
Place
Juelich (Germany, F.R.).